June 2002 update The
avionics stack was wired up earlier in the year as well as the lower
subpanel. Below you can see the installed panel and subpanel with the Skymap
GPS and the avionics stack. The GPS and avionics stack are both angled
towards the pilot for a better angle.

The
wing tanks are almost fully finished now including the installation of fuel
fittings, fuel level sensors, and gas caps. The picture immediately below
shows the space in the inboard left wing where one wing tank goes and the
picture below that shows the the installed right wing tank for comparison.
The tanks were pressure tested several weeks ago but some seepage was
occurring along the back of the tanks. Additional fiberglass work has since
been done to correct this (the wall there was too thin) and the tanks will
be retested very soon.