June 2003 update
The front windscreen has been cut and fitted but
has not been fully attached. The GPS antenna can be seen on the top of the
canopy area. A lighting and speaker console has been installed in the top of
the canopy (see bottom picture). It works, too!. Custom seat belts were
ordered and have been installed. The wing leveler has been installed and is
working also. The wing tip strobe lights have been wired and checked out as
working. The wing navigation lights work. The avionics stack works. The
instrument panel lights with dimmer work. The brow lights have been
installed but not checked out. The fuel control valve and control knob have
been installed. The wing tanks have been successfully pressure tested. The
rear enclosure of the canopy has begun. Windows will be cut in them and made
from the bubble. Gull wing doors are currently being constructed. All
firewall items have had mounting arrangements installed. The firewall
forward has been removed again. Richard is currently working off a
pre-fabric covering checklist. Completion of the canopy area is the single
largest remaining task on that checklist. It has been decided to cover the
aircraft without disassembling it again. So some tasks that were
postponed pending wing removal now need to be addressed while the wing is
installed. This includes the installation of additional inspect ports in the
bottom of the wing.