|
Oct 2003 update
The front windscreen has been fully attached.
The door frames have been constructed. Rear window openings have been cut.




Jan 2004 update
The door frames have been hinged. The fuel tanks
have been filled, tested for leaks & capacity, and then drained. The
fuselage tanks holds 20 gals while the wing tanks hold 10 gals each. Rear
seat back and bottom cushions have been made by the upholstery shop and
Velcro strips have been sewn to the cushions and glued to the cabin for
their installation. Below you can Ray filling areas of the fuselage in
preparation for covering. Covering of the control surfaces has begun as you
can see from the elevator below also.


previous
page
next
page Last updated on
April 06, 2004
|